Search

Safety Training
Found 1 items
CharacteristIcs Chaloem Ratchamongkhon Line Project installs safety measures in the design to prevent rain ingress at each station and tunnels. The station entrances and open channels are designed to be constructed at one meter above the 200-year flood level in Bangkok       The position of the station entrance is 1.2-1.5 meters high, the same height as the 200 years rainfall level.       The position of the depot approach ramp is constructed as high as the station entrances. Besides, there are pump sumps at the sloping end of the tunnel to hold rainwater as well as water pumps for the drainage of water in sumps out of the tunnel.       The position of each intervention building or emergency entrance is designed so that its base is constructed as high as the above-mentioned station entrance. Fire Prevention       The design and construction of the subway are carried out in accordance with the international standa.....

Relevant Agency Links

View All